Industrial Maintenance COGENERATION COKE FACILITY

McGraw Å®ÓÅÒùÍÞÅàѵӪ and Å®ÓÅÒùÍÞÅàѵӪ Industrial teamed to build a new heat recovery coke plant and steam generation facility spanning across a 225 acre greenfield site.

The project consisted of 100 coke ovens, 5 Heat Recovery Steam Generators, 67-MW steam driven power plant, flue gas desulphurization system, coal and coke handling systems. We self-performed over 90 percent of the projects 2,100,000 manhours with a peak in manpower at 844 employees.

The project was fast-tracked with much of the design released at the same time as construction. Meeting the Owner’s aggressive schedule required significant resources. Our team delivered a successful project through innovation in our construction and management processes.

PROJECT DETAILS:
  • Project Owner:
    Confidential Client
  • Location:
    Southwest Ohio
  • Project Value:
    $212 Million
  • Delivery Method:
    Design-Build
SERVICES:
  • Pipe Fabrication
  • Rigging & Equipment Setting
  • Structural Steel
  • Process Piping
  • Electrical & Instrumentation
  • Concrete