KEY CHALLENGES & PROJECT DETAIL

  • Placed over 5,500 CY of concrete including over 1000 cast in place concrete rail ties on 900鈥檟110鈥 coal loading pier
  • Installed 700 LF cast in place drainage trench
  • Installed new graded concrete deck on the pier to provide positive drainage to new trench
  • Installed 10鈥 directionally bored force main and pump system to move drainage trench water to upland storage pond
  • Removed and replaced coal loading conveyor system & crane rails, and supplied new water and electric service to the pier
  • Project required heavy multi-crane lifts to move coal loading truss on/off pier during construction
  • CMC sequenced work to allow CSX operate coal loading operations on the project continuously throughout construction
PROJECT DETAILS:
  • Project Owner:
    CSX Transportation
  • Location:
    Curtis Bay, Baltimore, MD
PROJECT AWARDS INCLUDE:
  • ACI Maryland 鈥 Excellence in Concrete Award