Transportation I-64 / Route 15 (Zion Crossroads) Interchange Improvements

KEY CHALLENGES & PROJECT DETAILS

  • Conversion of a standard diamond interchange to a diverging diamond interchange
  • This project set a precedent as the first Diverging Diamond Interchange in Virginia
  • Improves the I-64 interchange on Route 15 at Zion Crossroads and reconstructs the 0.49 mile stretch of Route 15.
  • Improves safety by reducing the number of spots where vehicles can collide and handles twice the capacity of left turns per hour.
  • Redesigned to eliminate trap lanes and detrimental weaves and included a study of interchange movements.
  • The project reduces maintenance costs with a reduction of pavement, runoff, raised medians, and right-of-way.
  • Reduced maintenance of traffic phases with the final traffic switch over taking place over one weekend.
PROJECT DETAILS:
  • Project Owner:
    Virginia Dept. of Transportation
  • Location:
    Zion Crossroads, VA
PROJECT AWARDS INCLUDE:
  • 2015 DBIA National Award of Merit (Transportation)
  • 2015 DBIA-MAR Design-Build Merit Award (Mid-Atlantic Region)
  • 2014-2015 American Council of Engineering Companies of Metropolitan Washington (ACEC/MW) Engineering Excellence Awards –Honor Award
  • 2014 VDOT Culpeper District Construction Project of the Year